connectix
Take a look at what some of our end users have to say about us!
“Connectix has provided us with a flexible, cost effective system which was installed on time and which has proved entirely reliable.”
Clifford French
Head of ICT
Camden School for Girls
![]()
"The excellent service we had received during those months from Olympic and Connectix was invaluable, at a critical time for the company."
Dave Giovanni
IT Director
Gregory Pennington
![]()
“It is our view that this [Research Machines case study] should prove that Connectix products and services are recommended highly by RM. Anyone considering other manufacturers should take heed of RM’s experiences and look at the proven track record of Connectix.”
Keith Spence
Solutions Director
Research Machines
![]()
“Connectix Cabling System was recommended by Cabling Solutions as a cost effective product which would suit the working environment of the school. We are pleased with the result, a comprehensive and flexible solution designed for education.”
Mr A Edgar BEng
Director of ICT
Culford School
![]()
"Looking at the completed installation, I cannot fault the quality of the work and would certainly recommend Electron and Connectix to any company undertaking a similar project."
Nik Chambers
Operations Director
C A Sothers
![]()
“The Lambpit Street project was delivered on price and on time in difficult circumstances when you consider we had to ensure the Council services remained open during the whole period of the project! Since the installation was completed we have had no issues with any links.”
Ralph Hardy
Support Services Manager
Wrexham Borough Council
![]()
"Alsinet have always delivered a cost effective and technically robust service that is underpinned by an excellent range of suppliers where lasting quality is the watchword."
Roy Hayes
Facilities Manager
Exodus Travel
![]()
“This has been a complex project we have had no problems since installation. You would expect teething issues which we had planned for but I am glad to say our planning time was wasted.”
Sid Hawkins
Engineering Support Manager
AAIB
![]()
“...our main contractor CAT Ltd supplied and installed an extensive fibre network, this is a key part of our operations on Frog Island. We are pleased to say they delivered a quality solution on time and on budget.”
Stephen Ray
Operations Director
Shanks East London
