Case Studies 

Latest | 2023 | 2022 | 2021 | 2019 | 2018 | 2017 | 2016 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006

107 cheapside

Business Environment’s IT and Communications team started the infrastructure installation in November 2010 and has worked quickly, professional and efficiently onsite. Speaking upon completion of the network cabling, Neil Hammond (Communications Engineer) explains; “We arrived on site whilst other contractors were still completing their phases of installation and started our design by sectioning the building into areas and certain rooms. We lifted all the floor tiles for the cabling pathways and ran the cables in situ for terminating within the floor boxes and routed back at the Connectix Equipment Racks. The Connectix Cabling Systems High Density Patch Panels and LJ6C RJ45 modules are quick and easy to terminate and this installation has been signed off without any problems and perfect link passes. We were able to rely on Connectix for competitive pricing and quick and reliable deliveries to our site, making things easier from our project management prospective”.

Read the Case Study